Search Municipal Codes

Municipalities
All municipalities
Filters
Click: include · Click again: exclude · Third click: clear
Clear domain filters
▶ Administration & Government 73
Administrative Hearings 3
Boards & Commissions 17
Budget, Purchasing & Funds 7
Elections
Employees, HR & Pensions 1
Ethics & Conduct
Governing Body (Elected) 2
Officers & Departments 6
Records, FOIA & Open Meetings 1
▶ Animals & Animal Control
Animal Control (Dogs & Cats)
Animal Licensing
Dangerous Animals
▶ Buildings & Construction 108
Electrical (NEC)
Energy (IECC)
Fire / Life-Safety (IFC) 2
General / Structural (IBC) 17
Mechanical (IMC)
Plumbing (IPC)
Property Maintenance (IPMC) 8
Residential (IRC) 2
▶ Business & Licensing 18
Amusements & Entertainment
General Business Licensing 4
Liquor Control
Regulated Trades 11
Tobacco & Cannabis 2
Charter & Formation
▶ Environment & Natural Resources 330
Air, Noise & Water Pollution 2
NPDES / MS4 Water Quality
Trees & Urban Forestry 91
Wetlands, Floodplain & Conservation 18
▶ General Provisions 126
Code Adoption & Enactment
General Definitions
General Penalty
Rules of Construction 3
▶ Health & Sanitation 56
Disease Control
Food Service & Handlers
Nuisances, Sanitation & Weeds 28
Pools & Recreational Health 1
▶ Human Relations & Civil Rights
Fair Housing
Human Rights & Anti-Discrimination
▶ Parks & Recreation 1
Park Use Rules & Conduct
Parks & Facilities 1
▶ Public Safety & Law Enforcement 5
Alarm Systems
Emergency Management
Fire Prevention & Response
Offenses Against Persons
Offenses Against Property 4
Peace, Order & Morals
Police Department & Powers
Weapons
▶ Streets & Public Property 881
Driveways & Approaches 2
Excavations & ROW Work 443
Public Property & Buildings 5
Streets, Sidewalks & Public Ways 27
▶ Subdivisions & Development 256
Dedications & Impact Fees 5
Design Standards 15
Plat Approval & Procedure 48
Required Improvements 28
▶ Taxation & Revenue 4
Excise Taxes 1
General Fee Schedules
Property Tax
Sales & Use Tax
Utility Tax
▶ Traffic & Vehicles 20
Automated/Photo Enforcement
Bicycles & Micromobility 1
Operation of Vehicles
Pedestrians
Rules of the Road 2
Speed Regulation
Stopping, Standing & Parking 6
Vehicle Equipment
▶ Utilities & Services 42
Cable/Video Franchise & PEG 14
Electric Service
Gas Service
Refuse, Garbage & Scavengers 1
Sanitary Sewer & Disposal 2
Storm & Drainage 11
Water Supply & Service 6
▶ Zoning & Land Use 753
Bulk & Dimensional Standards 1
Landscaping & Screening 136
Nonconformities 2
Off-Street Parking & Loading 8
Overlay & Special Districts 15
Permitted & Special Uses 19
Planned Unit Developments 111
Signs
Site Design 22
Use Districts 101
Zoning Administration 31
2,954 results for “tree preservation” · page 77 of 119
Melrose Park · 12.60.160

Construction methods and materials

This section outlines specific standards for construction methods within Melrose Park's rights-of-way, focusing on boring/jacking and trenching operations. It details requirements for pit excavation, shoring, permissible boring techniques based on diameter, and mandates tree preservation during underground work.

… Tree Preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accord with the applicable portions of Section 603 of IDOT's "Standard Specifications …
Streets & Public Property
South Chicago Heights · 82.466

Construction methods and materials

This section outlines specific construction methods and materials for utility facilities in rights-of-way, detailing requirements for boring/jacking operations, including pit management, shoring, diameter limitations, and tree preservation. It also references IDOT standards for trenching and limits open trench lengths.

… Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accord with the applicable portions of Section 603 of IDOT's "Standard Specifications …
Streets & Public Property
Oak Forest · 151.081

Construction Methods And Materials

This section outlines standards for boring or jacking, including pit requirements, limitations on wet boring, specifications for bore diameters, and tree preservation measures. It also references IDOT specifications for trenching, emphasizing minimizing open trench length and limiting simultaneous work at intersections.

… Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation …
Streets & Public Property
Crystal Lake · 427.16

Construction methods and materials

This section outlines specific construction methods and material standards for facilities within the City of Crystal Lake's right-of-way, focusing on boring/jacking and trenching operations. It details requirements for pit management, auger sizes, wet boring prohibitions, and adherence to external engineering specifications.

… Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the City to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation …
Countryside · 7.10.16

Construction Methods And Materials

This section outlines specific requirements for construction methods in rights of way, including detailed regulations for boring/jacking and trenching, with a focus on safety, environmental protection (tree preservation), and adherence to external standards.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property
Westmont · 82.366

Construction methods and materials

This section outlines specific standards and requirements for construction methods used in rights-of-way, focusing on boring/jacking and trenching operations, including pit management, wet boring prohibitions, and auger specifications.

… Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accord with the applicable portions of Section 603 of IDOT's "Standard Specifications …
Streets & Public Property
Third Lake · 22.68

Construction methods and materials

This section outlines specific standards and requirements for boring, jacking, and trenching operations within Village rights-of-way, focusing on pit management, excavation limitations, and methods for different boring diameters. It also references IDOT's Standard Specifications for Road and Bridge Construction for trenching.

… Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accord with the applicable portions of section 603 of IDOT's Standard Specifications …
Streets & Public Property
Hanover Park · 86.226

Construction methods and materials

This section outlines construction methods and materials for utility facilities in rights-of-way, detailing requirements for boring, jacking, and trenching, including pit management, specific boring techniques, and adherence to IDOT standards.

… Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (v) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation …
Streets & Public Property
Sandwich · 70.97

Construction methods and materials

This section outlines specific standards and requirements for construction methods used in Sandwich's rights-of-way, focusing on boring/jacking and trenching operations. It details pit requirements, prohibitions on wet boring under roadways, auger specifications, and tree preservation measures.

… Tree preservation. Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accordance with the applicable portions of section 603 of IDOT's "Standard Specifications …
Streets & Public Property
Beach Park · 13.02.160

Construction Methods And Materials

This section outlines construction methods and material standards for utility facilities in Beach Park rights-of-way, specifically detailing requirements for boring/jacking and trenching operations to ensure safety and minimize disruption.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property
Island Lake · 4.10.16

Construction Methods and Materials

This section outlines specific standards and requirements for construction methods, including boring, jacking, and trenching, within Village rights of way. It details requirements for open pits, wet boring, auger use, and the preservation of trees during underground construction.

… Tree Preservation: Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. 2. Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard Specifications …
Administration & Government
Diamond · 158.33

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility installations within rights-of-way in Diamond, focusing on boring/jacking and trenching techniques. It details requirements for excavation, shoring, pipe diameters, and tree preservation for boring, and references external standards for trenching.

… Borings of 6 inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation . Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching . Trenching for facility installation …
Streets & Public Property
Batavia · 7.4.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities in Batavia's rights-of-way, including detailed regulations for boring/jacking and trenching operations, with specific considerations for pit management, boring diameter, and tree preservation.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property
Prospect Heights · 11.7.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities in rights-of-way, focusing on boring/jacking operations and trenching. It details pit dimensions, shoring standards, restrictions on wet boring, auger/pipe diameter limitations, and tree preservation measures for boring, while referencing IDOT specifications for trenching.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property
Elburn · 1020.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities in rights-of-way, detailing standards for boring, jacking, trenching, and tree preservation, with emphasis on safety and minimizing disruption.

… Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (v) Tree preservation. Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. b. Trenching. Trenching for facility installation …
Streets & Public Property
Fox Lake · 7.1D-16

Construction Methods And Materials

This section outlines construction methods and material requirements for utility facilities in rights-of-way in Fox Lake, focusing on boring/jacking and trenching techniques, including specific regulations for pit dimensions, excavation timelines, and pipe diameters, as well as tree preservation measures.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property
Woodstock · 6.1D.16

Construction Methods And Materials

This section outlines construction methods and materials for utility facilities in rights-of-way, detailing requirements for boring/jacking operations including pit management and diameter restrictions, and specifying trenching to adhere to IDOT standards.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property
Matteson · 100.16

Construction Methods And Materials

This section outlines specific standards and requirements for construction methods used in rights-of-way, focusing on boring/jacking and trenching techniques. It details pit requirements, excavation timelines, shoring standards, and specifications for different boring diameters, as well as tree preservation measures.

… Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation …
Streets & Public Property
Elk Grove Village · 8.7.9.16

Construction Methods And Materials

This section establishes technical standards and safety requirements for boring, jacking, and trenching operations conducted within municipal rights-of-way. It mandates specific excavation procedures, equipment limitations, and environmental protections for trees.

… Tree Preservation: Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. 2. Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of IDOT's "Standard Specifications For Road And …
Elwood · 51.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities within public rights-of-way in Elwood. It details standards for boring, jacking, and trenching operations, including pit management, boring techniques based on diameter, and tree preservation measures.

… Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation . Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation …
Streets & Public Property
Buffalo Grove · 12.04.160

Construction methods and materials

This section of the Buffalo Grove ordinance outlines specific standards for construction methods on public rights-of-way, focusing on boring/jacking and trenching techniques. It includes requirements for excavation timing, pit protection, shoring, pipe diameter limits for boring, and adherence to IDOT specifications for trenching.

… Tree Preservation. Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accord with the applicable portions of Section 603 of IDOT's "Standard Specifications …
Streets & Public Property
South Elgin · 53.33

Construction Methods And Materials

This section outlines specific construction methods and material requirements for boring, jacking, and trenching operations within South Elgin's rights-of-way, including provisions for pit management, shoring, and tree preservation.

… Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation …
Streets & Public Property
Wayne · 7.8.16

Construction Methods And Materials

This section outlines construction methods and material standards for utility facilities within rights of way, detailing requirements for boring/jacking operations, including pit management, wet boring prohibitions, auger specifications, and tree preservation measures, as well as trenching protocols referencing IDOT specifications and limiting open trench length at intersections.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property
Lynwood · 58.66

Construction methods and materials

This section outlines specific construction methods and material standards for utility facilities in rights-of-way, detailing requirements for boring/jacking operations, trenching, and associated safety and environmental considerations.

… Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard Specifications …
Streets & Public Property
Inverness · 8.5.16

Construction Methods And Materials

This section outlines specific standards and requirements for construction methods used in rights of way, focusing on boring/jacking and trenching techniques. It details regulations for pit excavation, shoring, bore diameters, and addresses tree preservation during construction.

… e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights of way shall be done in accord with the applicable portions of section 603 of IDOT's "Standard …
Streets & Public Property