Search Municipal Codes

Municipalities
All municipalities
Filters
Click: include · Click again: exclude · Third click: clear
Clear domain filters
▶ Administration & Government 53
Administrative Hearings 2
Boards & Commissions 17
Budget, Purchasing & Funds 3
Elections
Employees, HR & Pensions
Ethics & Conduct
Governing Body (Elected) 2
Officers & Departments 7
Records, FOIA & Open Meetings
▶ Animals & Animal Control
Animal Control (Dogs & Cats)
Animal Licensing
Dangerous Animals
▶ Buildings & Construction 115
Electrical (NEC)
Energy (IECC)
Fire / Life-Safety (IFC) 2
General / Structural (IBC) 18
Mechanical (IMC)
Plumbing (IPC)
Property Maintenance (IPMC) 9
Residential (IRC) 2
▶ Business & Licensing 18
Amusements & Entertainment
General Business Licensing 4
Liquor Control
Regulated Trades 11
Tobacco & Cannabis 2
Charter & Formation
▶ Environment & Natural Resources 337
Air, Noise & Water Pollution 3
NPDES / MS4 Water Quality
Trees & Urban Forestry 90
Wetlands, Floodplain & Conservation 18
▶ General Provisions 109
Code Adoption & Enactment
General Definitions
General Penalty
Rules of Construction 2
▶ Health & Sanitation 52
Disease Control
Food Service & Handlers
Nuisances, Sanitation & Weeds 27
Pools & Recreational Health 1
▶ Human Relations & Civil Rights
Fair Housing
Human Rights & Anti-Discrimination
▶ Parks & Recreation 1
Parks & Facilities 1
Park Use Rules & Conduct
▶ Public Safety & Law Enforcement 4
Alarm Systems
Emergency Management
Fire Prevention & Response
Offenses Against Persons
Offenses Against Property 4
Peace, Order & Morals
Police Department & Powers
Weapons
▶ Streets & Public Property 892
Driveways & Approaches 2
Excavations & ROW Work 444
Public Property & Buildings 5
Streets, Sidewalks & Public Ways 25
▶ Subdivisions & Development 237
Dedications & Impact Fees 5
Design Standards 15
Plat Approval & Procedure 48
Required Improvements 28
▶ Taxation & Revenue 4
Excise Taxes 1
General Fee Schedules
Property Tax
Sales & Use Tax
Utility Tax
▶ Traffic & Vehicles 18
Automated/Photo Enforcement
Bicycles & Micromobility 1
Operation of Vehicles
Pedestrians
Rules of the Road 2
Speed Regulation
Stopping, Standing & Parking 4
Vehicle Equipment
▶ Utilities & Services 45
Cable/Video Franchise & PEG 14
Electric Service
Gas Service
Refuse, Garbage & Scavengers 1
Sanitary Sewer & Disposal 3
Storm & Drainage 11
Water Supply & Service 8
▶ Zoning & Land Use 731
Bulk & Dimensional Standards 1
Landscaping & Screening 137
Nonconformities
Off-Street Parking & Loading 8
Overlay & Special Districts 15
Permitted & Special Uses 19
Planned Unit Developments 108
Signs
Site Design 22
Use Districts 97
Zoning Administration 30
2,819 results for “tree preservation” · page 22 of 113
Manhattan · 8.6.16

Construction Methods And Materials

This section outlines specific standards and requirements for construction methods, particularly boring or jacking and trenching, within public rights of way in Manhattan. It references IDOT specifications and details requirements for pit excavation, shoring, wet boring, bore diameter limitations, and tree preservation.

village engineer. d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, directional drilling, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for all areas, and especially for paved or hard surface...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Lines Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
South Chicago Heights · 82.466

Construction methods and materials

This section outlines specific construction methods and materials for utility facilities in rights-of-way, detailing requirements for boring/jacking operations, including pit management, shoring, diameter limitations, and tree preservation. It also references IDOT standards for trenching and limits open trench lengths.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
West Dundee · 8.9.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities in rights-of-way, detailing standards for boring, jacking, and trenching operations, including safety and environmental considerations.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
University Park · 1028.16

Construction methods and materials

This section outlines specific construction methods and material requirements for utility facilities in public rights-of-way within University Park. It details standards for boring, jacking, trenching, and addresses tree preservation during these operations.

inch (25 mm). iv. Borings with diameters six (6) inches or less. Borings of six (6) inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. v. Tree preservation. Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. iii. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the Village to be preserved. (3) Backfilling. i. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Lemont · 12.30.160

Construction methods and materials

This section outlines specific construction methods and material requirements for utility facilities in public rights-of-way, detailing standards for boring/jacking operations, trenching, and tree preservation. It mandates adherence to IDOT specifications for trenching and includes detailed requirements for pit management, wet boring, and auger/pipe usage for different bore diameters.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with the current edition
Streets & Public Property
Gilberts · 9.8C-10

Construction methods and materials

This section outlines specific construction methods and material requirements for facilities in public rights-of-way, detailing standards for boring, jacking, and trenching operations, including pit management, excavation timing, shoring, and tree preservation.

more than one inch (25 mm). d. Borings with Diameters Six Inches or Less: Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree Preservation: Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c. Drip Line of Trees: The permittee shall not trench within the drip line of any tree designated by the Village to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Homewood · 34.340

Construction methods and materials

This section outlines specific construction methods and material requirements for utilities within Homewood's rights-of-way, focusing on boring/jacking and trenching operations, with detailed provisions for pit management, wet boring, auger usage, and tree preservation.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Waukegan · 14.1166

Construction methods and materials

This section outlines construction methods and materials for utility facilities in Waukegan's rights-of-way, referencing IDOT Standard Specifications for Road and Bridge Construction. It details requirements for boring/jacking and trenching, including pit management, wet boring prohibitions, diameter limitations, and tree preservation.

advance by the city engineer. d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, directional drilling, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the city to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's Standard Specifications
Streets & Public Property
Fox Lake · 7.1D-16

Construction Methods And Materials

This section outlines construction methods and material requirements for utility facilities in rights-of-way in Fox Lake, focusing on boring/jacking and trenching techniques, including specific regulations for pit dimensions, excavation timelines, and pipe diameters, as well as tree preservation measures.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
La Grange Park · 98.016

Construction Methods And Materials

This section outlines specific construction methods and material requirements for boring, jacking, and trenching within La Grange Park's rights-of-way. It details requirements for pit excavation, shoring, wet boring, auger usage, and tree preservation during these operations.

more than one inch (25 mm). (d) Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c) Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling . (a)   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's Standard Specifications
General Provisions
Hinsdale · 7.1G-16

Construction Methods And Materials

This section outlines construction methods and materials for utility facilities in Hinsdale's rights-of-way, specifying requirements for boring, jacking, and trenching operations to ensure safety and minimize disruption.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Itasca · 56.17

Construction Methods And Materials

This section outlines specific requirements for boring or jacking and trenching operations within public rights-of-way in Itasca. It details pit dimensions, timing, safety measures, and methods for different boring diameters, as well as referencing IDOT specifications for trenching.

more than one inch (25 mm). (d) Borings with Diameters Six Inches or Less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree Preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching . Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c) Drip Line of Trees. The entity shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling . (a) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's Standard Specifications
Streets & Public Property
Batavia · 7.4.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities in Batavia's rights-of-way, including detailed regulations for boring/jacking and trenching operations, with specific considerations for pit management, boring diameter, and tree preservation.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the city to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Stickney · 86.266

Construction methods and materials

This section outlines specific construction methods and material requirements for utility facilities within village rights-of-way, focusing on boring/jacking and trenching operations to ensure safety and minimize disruption.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Elwood · 51.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities within public rights-of-way in Elwood. It details standards for boring, jacking, and trenching operations, including pit management, boring techniques based on diameter, and tree preservation measures.

more than one inch (25 mm). (d) Borings with diameter six inches or less . Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation . Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c) Drip line of trees . The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. (a)   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Matteson · 100.16

Construction Methods And Materials

This section outlines specific standards and requirements for construction methods used in rights-of-way, focusing on boring/jacking and trenching techniques. It details pit requirements, excavation timelines, shoring standards, and specifications for different boring diameters, as well as tree preservation measures.

more than one inch (25 mm). (d) Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c) Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. (a)   Any pit, trench or excavation created during the installation of facilities shall be backfilled for its full width, depth and length using methods and materials in accordance with IDOT’s Standard Specifications
Streets & Public Property
Bartlett · 7.6.16

Construction Methods And Materials

This section outlines construction methods and material requirements for utility facilities in Bartlett's rights-of-way, specifying procedures for boring/jacking and trenching, including pit management, pipe diameters, and tree preservation.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Grayslake · 15.44.160

Construction methods and materials

This section outlines specific construction methods for utility facilities in rights-of-way, detailing requirements for boring, jacking, and trenching, including pit management, pipe sizing, and tree preservation.

more than one inch (25 mm). d. Borings with Diameters 6 Inches or Less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree Preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Hinsdale · 7.1G-16

Construction Methods And Materials

This section outlines construction methods and materials for utility facilities in Hinsdale's rights-of-way, specifying requirements for boring, jacking, and trenching operations to ensure safety and minimize disruption.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Willow Springs · 5.5.16

Construction Methods And Materials

This section outlines specific standards and requirements for construction methods in rights-of-way, focusing on boring and jacking techniques, including requirements for pit locations, excavation timelines, shoring, and specific methods based on bore diameter. It also touches on tree preservation and trenching practices.

advance by the Village Engineer. (v) Borings with Diameters 6 Inches or Less. Borings of six inches or less in diameter may be accomplished by either directional drilling, jacking, guided with auger, or auger and following pipe method. (vi) Tree Preservation. Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. b. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (iii) Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the Village to be preserved. c. Backfilling. (i) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Norridge · 82.116

Construction methods and materials

This section outlines specific construction methods and material standards for utility facilities in Norridge's public rights-of-way, focusing on boring/jacking techniques and trenching procedures, including requirements for open trenches and tree preservation.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's Standard Specifications
Streets & Public Property
South Elgin · 53.33

Construction Methods And Materials

This section outlines specific construction methods and material requirements for boring, jacking, and trenching operations within South Elgin's rights-of-way, including provisions for pit management, shoring, and tree preservation.

more than one inch (25 mm). (d) Borings with diameters of six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c) Drip line of trees. The utility shall not trench within the drip line of any, tree designated by the village to be preserved. (3) Backfilling. (a)   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT’s Standard Specifications
Streets & Public Property
Melrose Park · 12.60.160

Construction methods and materials

This section outlines specific standards for construction methods within Melrose Park's rights-of-way, focusing on boring/jacking and trenching operations. It details requirements for pit excavation, shoring, permissible boring techniques based on diameter, and mandates tree preservation during underground work.

more than one inch (25 mm). d. Borings with Diameters Six Inches or Less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree Preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
East Dundee · 54.16

Construction Methods And Materials

This section outlines specific standards for construction methods within rights-of-way, detailing requirements for boring/jacking operations including pit management, shoring, and equipment specifications, as well as trenching practices that must adhere to state road construction specifications.

more than one inch (25 mm). (d)   Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e)   Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c)   Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. (a)   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's Standard Specifications
Streets & Public Property
Palos Park · 1030.16

Construction Methods And Materials.

This section outlines specific construction methods and material requirements for utility facilities in Palos Park's rights-of-way, focusing on boring/jacking and trenching techniques, including pit management, diameter restrictions, and tree preservation.

more than one inch (25 mm). D.   Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. E.   Tree preservation. Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. (2) Trenching . Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. C.   Drip line of trees. The utility shall not trench within the drip line of any tree designated by the Village to be preserved. (3) Backfilling . A.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications