Search Municipal Codes

Municipalities
All municipalities
Filters
Click: include · Click again: exclude · Third click: clear
Clear domain filters
Administration & Government 53
Administrative Hearings 2
Boards & Commissions 17
Budget, Purchasing & Funds 3
Elections
Employees, HR & Pensions
Ethics & Conduct
Governing Body (Elected) 2
Officers & Departments 7
Records, FOIA & Open Meetings
Animals & Animal Control
Animal Control (Dogs & Cats)
Animal Licensing
Dangerous Animals
Buildings & Construction 115
Electrical (NEC)
Energy (IECC)
Fire / Life-Safety (IFC) 2
General / Structural (IBC) 18
Mechanical (IMC)
Plumbing (IPC)
Property Maintenance (IPMC) 9
Residential (IRC) 2
Business & Licensing 18
Amusements & Entertainment
General Business Licensing 4
Liquor Control
Regulated Trades 11
Tobacco & Cannabis 2
Charter & Formation
Environment & Natural Resources 337
Air, Noise & Water Pollution 3
NPDES / MS4 Water Quality
Trees & Urban Forestry 90
Wetlands, Floodplain & Conservation 18
General Provisions 109
Code Adoption & Enactment
General Definitions
General Penalty
Rules of Construction 2
Health & Sanitation 52
Disease Control
Food Service & Handlers
Nuisances, Sanitation & Weeds 27
Pools & Recreational Health 1
Human Relations & Civil Rights
Fair Housing
Human Rights & Anti-Discrimination
Parks & Recreation 1
Parks & Facilities 1
Park Use Rules & Conduct
Public Safety & Law Enforcement 4
Alarm Systems
Emergency Management
Fire Prevention & Response
Offenses Against Persons
Offenses Against Property 4
Peace, Order & Morals
Police Department & Powers
Weapons
Streets & Public Property 892
Driveways & Approaches 2
Excavations & ROW Work 444
Public Property & Buildings 5
Streets, Sidewalks & Public Ways 25
Subdivisions & Development 237
Dedications & Impact Fees 5
Design Standards 15
Plat Approval & Procedure 48
Required Improvements 28
Taxation & Revenue 4
Excise Taxes 1
General Fee Schedules
Property Tax
Sales & Use Tax
Utility Tax
Traffic & Vehicles 18
Automated/Photo Enforcement
Bicycles & Micromobility 1
Operation of Vehicles
Pedestrians
Rules of the Road 2
Speed Regulation
Stopping, Standing & Parking 4
Vehicle Equipment
Utilities & Services 45
Cable/Video Franchise & PEG 14
Electric Service
Gas Service
Refuse, Garbage & Scavengers 1
Sanitary Sewer & Disposal 3
Storm & Drainage 11
Water Supply & Service 8
Zoning & Land Use 731
Bulk & Dimensional Standards 1
Landscaping & Screening 137
Nonconformities
Off-Street Parking & Loading 8
Overlay & Special Districts 15
Permitted & Special Uses 19
Planned Unit Developments 108
Signs
Site Design 22
Use Districts 97
Zoning Administration 30
2,819 results for “tree preservation” · page 21 of 113
Romeoville · 55.16

Construction Methods And Materials

This section outlines construction methods and material standards for utility facilities in Romeoville's rights-of-way, specifically detailing requirements for boring/jacking and trenching operations. It references IDOT standards and provides specifications for pit excavation, shoring, different boring diameters, and tree preservation.

advance by the Village Engineer. (d) Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, directional drilling, guided with auger or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for all areas and especially for paved...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c) Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. (a)   Any pit, trench or excavation created during the installation of facilities shall be backfilled for its full width, depth and length using methods and materials in accordance with IDOT’s “Standard Specifications
Streets & Public Property
Plano · 4.10.16

Construction Methods And Materials

This section outlines specific construction methods and material standards for utility facilities in public rights-of-way in Plano. It details requirements for boring/jacking operations, including pit dimensions and timing, and specifies limitations for wet boring and auger sizes. Trenching must comply with IDOT standards, with an emphasis on minimizing open trench lengths.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the city to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Steger · 19.16

Construction methods and materials

This section outlines specific construction methods and material requirements for utility facilities within Steger's rights-of-way, detailing standards for boring/jacking and trenching operations.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Elmhurst · 5.67

Construction methods and materials

This section outlines specific standards for boring, jacking, and trenching operations within public rights-of-way. It details requirements for pit construction, excavation timelines, shoring, and methods for different boring diameters, with specific provisions for tree preservation and adherence to IDOT specifications for trenching.

more than one inch (25 mm). (D) Borings with Diameters Six Inches or Less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (E) Tree Preservation. Any facility located within the drip line of any tree designated by the City to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (C) Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the City to be preserved. (3) Backfilling. (A) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Forest Park · 7.5.16

Construction Methods And Materials

This section outlines specific construction methods and material standards for right-of-way work in Forest Park, focusing on boring/jacking and trenching operations. It details requirements for pit construction, shoring, wet boring, bore diameter specifications, and tree preservation, while referencing IDOT standards for trenching.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Coal City · 95.118

Construction methods and materials

This section outlines specific construction methods and materials for utility facilities in rights-of-way, detailing requirements for boring, jacking, and trenching operations, including pit management, wet boring prohibitions, auger specifications, and tree preservation during excavation.

more than one inch (25 mm).(d) Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method.(e) Tree preservation. Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system.(2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location.(c) Drip line of trees. The utility shall not trench within the drip line of any tree designated by the Village to be preserved.(3) Backfilling.(a) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's Standard Specifications
Streets & Public Property
La Grange · 5.5.75

Construction Methods and Materials

This section outlines specific construction methods and material requirements for utility facilities within public rights-of-way in La Grange. It details standards for boring/jacking operations, including pit dimensions, timing, shoring, and diameter limitations, as well as requirements for trenching based on IDOT specifications.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either Jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any Facility located within the drip line of any tree designated by the Village to be preserved or protected must comply with the requirements of this Code. (2) Trenching. Trenching for Facility installation, repair, or maintenance on Rights...windrowing excavated material off the paved portion of the Roadway, excavated material must be hauled to an off-road location. c. Drip line of trees. The Utility may not Trench within the drip line of any tree designated by the Village to be preserved. (3) Backfilling. a. Any pit, Trench, or Excavation created during the installation of Facilities must be Backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's Standard Specifications
Streets & Public Property
Park City · 12.16.160

Construction methods and materials

This section establishes standards for trenching and boring/jacking operations within Park City rights-of-way. It details requirements for pit excavation, shoring, pipe diameters, and tree preservation for boring, and references IDOT specifications for trenching.

more than one inch (twenty-five mm). d. Borings with Diameters Six Inches or Less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree Preservation. Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the city to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Burnham · 82.256

Construction methods and materials

This section outlines standards and requirements for boring or jacking and trenching methods for utility facilities within Burnham's rights-of-way. It specifies requirements for pit excavation, shoring, boring diameters, and addresses tree preservation.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger or following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Crete · 22.30

Construction methods and materials

This section outlines construction method standards for utility facilities in rights-of-way, detailing requirements for boring/jacking operations, including pit management, specific diameter limitations, and tree preservation. It also references IDOT specifications for trenching and specifies limitations on open trench lengths.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Yorkville · 7.8.16

Construction methods and materials

This section establishes standards for construction methods used in rights-of-way, specifically detailing requirements for boring/jacking and trenching operations, including pit management, pipe diameter limitations, and tree preservation.

inch (1") (25 mm). d. Borings with diameters six inches (6") or less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation: Any facility located within the drip line of any tree designated by the City to be preserved or protected shall be bored under or around the root system. 2. Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c. Drip line of trees: The utility shall not trench within the drip line of any tree designated by the City to be preserved. 3. Backfilling: a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Worth · 7.14.16

Construction Methods And Materials

This section outlines specific standards and requirements for construction methods in rights-of-way, focusing on boring/jacking and trenching operations. It details requirements for excavation, shoring, pipe diameters, and tree preservation for boring, and references external specifications for trenching.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the Village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
North Chicago · 9.7.17

CONSTRUCTION METHODS AND MATERIALS

This section outlines specific standards for construction methods within North Chicago rights-of-way, focusing on boring/jacking and trenching techniques, including pit management, boring diameter limitations, and tree preservation considerations.

than one inch (25 mm). (iv) Borings with Diameters Six (6) Inches or Less. Borings of six (6) inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (v) Tree Preservation. Any facility located within the drip line of any tree designated by the City to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (iii) Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the City to be preserved. (3) Backfilling. (i) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Mundelein · 14.43.160

Construction methods and materials

This section outlines specific requirements for construction methods, including boring/jacking and trenching, within Mundelein's rights-of-way. It details pit excavation, shoring, boring diameters, and trenching practices, referencing IDOT standards.

more than one inch (25 mm). (iv) Borings with Diameters Six Inches or Less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (v) Tree Preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (iii) Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. (i) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Winthrop Harbor · 53.16

Construction Methods And Materials

This section outlines specific construction methods and material requirements for utility facilities in Winthrop Harbor's rights-of-way, detailing standards for boring/jacking and trenching operations, including pit management, diameter restrictions, and tree preservation considerations.

more than one inch (25 mm). (d) Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. (c) Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. (a)   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Homewood · 34.340

Construction methods and materials

This section outlines specific construction methods and material requirements for utilities within Homewood's rights-of-way, focusing on boring/jacking and trenching operations, with detailed provisions for pit management, wet boring, auger usage, and tree preservation.

more than one inch (25 mm). d. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. (3) Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Elgin · 13.15.160

Construction methods and materials

This section outlines specific construction methods and material requirements for utility facilities in public rights-of-way, detailing standards for boring/jacking operations, trenching, and tree preservation.

than one (1) inch (25 mm). d. Borings with diameters six inches or less. Borings of six (6) inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the city to be preserved shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the city to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with the IDOT Standard Specifications
Streets & Public Property
Blue Island · 163.14

Construction; Standards, Methods And Materials

This section outlines the general standards, methods, and materials required for all construction within the right-of-way in Blue Island. It mandates compliance with various municipal ordinances, state laws, and specific IDOT publications, with the City Building Department Commissioner having final decision-making authority in case of discrepancies.

more than one inch (25 mm). 4. Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger or auger and following pipe method. 5. Tree preservation. Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system. (b) Trenching. Trenching for facility installation, repair or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. 3. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the city to be preserved. (c) Backfilling. 1.   Any pit, trench or excavation created during the installation of facilities shall be backfilled for its full width, depth and length using methods and materials in accordance with IDOT’s Standard Specifications
Streets & Public Property
University Park · 1028.16

Construction methods and materials

This section outlines specific construction methods and material requirements for utility facilities in public rights-of-way within University Park. It details standards for boring, jacking, trenching, and addresses tree preservation during these operations.

inch (25 mm). iv. Borings with diameters six (6) inches or less. Borings of six (6) inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. v. Tree preservation. Any facility located within the drip line of any tree designated by the Village to be preserved or protected shall be bored under or around the root system. (2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. iii. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the Village to be preserved. (3) Backfilling. i. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
River Grove · 3.7.16

Construction Methods And Materials

This section outlines specific construction methods and material standards for utility facilities in River Grove's rights-of-way, covering boring, jacking, and trenching operations. It emphasizes safety, environmental considerations like tree preservation, and adherence to external construction standards.

more than one inch (1") (25mm). (d) Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. (e) Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. (c) Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: (a) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Manhattan · 8.6.16

Construction Methods And Materials

This section outlines specific standards and requirements for construction methods, particularly boring or jacking and trenching, within public rights of way in Manhattan. It references IDOT specifications and details requirements for pit excavation, shoring, wet boring, bore diameter limitations, and tree preservation.

village engineer. d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, directional drilling, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for all areas, and especially for paved or hard surface...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Lines Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Vernon Hills · Section 1.15

Construction Methods and materials

This section outlines specific construction methods and material requirements for utility facilities within Vernon Hills' rights-of-way, focusing on boring/jacking and trenching techniques. It details safety, operational, and preservation standards for these activities.

more than one inch (25 mm). iv) Borings with diameters six inches or less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. v) Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2) Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. iii) Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3) Backfilling. i) Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Villa Park · 13.1116

Construction methods and materials

This section outlines specific construction methods and material requirements for utility facilities in Villa Park's public rights-of-way, focusing on boring/jacking and trenching operations. It details excavation timing, shoring standards, specific boring techniques based on diameter, and tree preservation measures.

inch (25 mm). d. Borings with diameters six (6) inches or less. Borings of six (6) inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree preservation. Any facility located within the drip line of any tree designated by the village to be preserved shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip line of trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Hainesville · 13.30.160

Construction methods and materials

This section establishes specific standards for construction methods used in rights-of-way, including requirements for boring/jacking operations and trenching. It mandates protection measures for open pits, limits wet boring, defines acceptable boring diameters and methods, and includes provisions for tree preservation.

than one inch (twenty-five (25) mm). d. Borings with Diameters Six Inches or Less. Borings of six inches or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e. Tree Preservation. Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2. Trenching. Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. c. Drip Line of Trees. The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3. Backfilling. a. Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property
Lake Villa · 5.10.16

Construction Methods And Materials

This section outlines specific construction methods and material standards for utility facilities in Lake Villa rights-of-way, covering boring/jacking and trenching operations, with requirements for pit management, pipe diameters, and tree preservation.

than one inch (1") (25 mm). d.   Borings With Diameters Six Inches Or Less: Borings of six inches (6") or less in diameter may be accomplished by either jacking, guided with auger, or auger and following pipe method. e.   Tree Preservation: Any facility located within the drip line of any tree designated by the village to be preserved or protected shall be bored under or around the root system. 2.   Trenching: Trenching for facility installation, repair, or maintenance on rights...windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off road location. c.   Drip Line Of Trees: The utility shall not trench within the drip line of any tree designated by the village to be preserved. 3.   Backfilling: a.   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length using methods and materials in accordance with IDOT's "Standard Specifications
Streets & Public Property